Floor repair section cut out, folded and zinc coated where it can't be reached later. Nice tight fit ready for welding.

   

Side has tight gaps too. Did the plug welds first so it can't move out of position.

   

Bottom and sides have been plug welded and fully welded to the floor.

   

I used one of the stake dollies I had made as a heavy weight to hammer against to stretch the weld shrink out to straighten the side. I hammered from the bottom up as the weld had pulled it downwards.

   

The other corner was no where near as bad and just cut out the area effected. Welded in a new floor section first and sprayed zinc primer down inside the frame rail ready for the new section.

[BACK][NEXT]

[Index]